Case study · Fitness & leisure · Exterior

Fitness facility exterior refurbishment

A coordinated exterior spray-finishing brief spanning metal cladding, window frames, roller shutters, canopy and a brickwork band. This project shows how several substrates can be surveyed and scoped together.

Long commercial unit after cladding spray finishing — black corrugated cladding, thin red roof trim and black roller shutters
Finished cladding elevation — black corrugated panels, thin red roof trim and black shutters

Surveyed scope

  • Typeexterior commercial spray finishing
  • SectorFitness and leisure
  • LocationNot published
  • Cladding~384 m² scoped elevation
  • Windows11 aluminium · 29 UPVC
  • OtherThree shutters · canopy · brickwork band
  • AccessElevated access in the plan
  • DurationNot published

Finish

Cladding, canopy, shutters and window frames were spray finished as one coordinated black and red package. Product grades, application records and exact duration remain internal to the project file.

Before and after

The same long cladding elevation, shown before preparation and after the spray finish.

Before
Faded silver and beige corrugated metal cladding on a long commercial unit before spray finishing, with red roller shutters and an overgrown yard
Weathered silver/beige cladding and red shutters prior to works
After
Same long commercial unit after cladding spray finishing — black corrugated cladding, thin red roof trim and black roller shutters
Same elevation after spray finishing — black cladding, thin red roof trim and black shutters

Mixed-substrate building

The building combined a large metal cladding area with aluminium and UPVC frames, shutters, an entrance canopy and masonry details. The challenge was a coordinated finish without treating unlike substrates as if they shared one preparation or coating schedule.

The scope called for substrate-specific surface checks, cleaning and preparation, protection of glazing and adjoining areas, and a phased access plan. Coating product details, application records and exact duration remain internal to the project file.

On site

Masking, elevated access and staged spraying across cladding, frames, canopy and shutters.

Result

The commercial exterior was spray-finished as a combined cladding, canopy, frame and shutter package in a coordinated black and red finish.